HomeProjectsOperational Excellence Programme

Operational Excellence Programme

Operational Excellence Programme
Operations9 months
Client

UK Manufacturing Company

Category

Operations

Duration

9 months

Project Overview

A mid-size UK manufacturer engaged Tiege Consult to design and implement a comprehensive operational excellence programme.

40%

Throughput Up

35%

Waste Reduced

50%

Quality Up

£1.8M

Cost Savings

The Challenge

The client was experiencing high waste levels, inconsistent product quality, and production bottlenecks that limited their ability to meet growing demand.

Our Solution

We implemented lean manufacturing principles, redesigned production workflows, and introduced real-time monitoring systems to track KPIs across all production lines.

Key Results

Improved production throughput by 40%
Reduced waste by 35%
Improved product quality consistency by 50%
Decreased lead times from 14 to 8 days
Annual cost savings of £1.8M