Operations9 months
Client
UK Manufacturing Company
Category
Operations
Duration
9 months
Project Overview
A mid-size UK manufacturer engaged Tiege Consult to design and implement a comprehensive operational excellence programme.
40%
Throughput Up
35%
Waste Reduced
50%
Quality Up
£1.8M
Cost Savings
The Challenge
The client was experiencing high waste levels, inconsistent product quality, and production bottlenecks that limited their ability to meet growing demand.
Our Solution
We implemented lean manufacturing principles, redesigned production workflows, and introduced real-time monitoring systems to track KPIs across all production lines.
Key Results
Improved production throughput by 40%
Reduced waste by 35%
Improved product quality consistency by 50%
Decreased lead times from 14 to 8 days
Annual cost savings of £1.8M